|
Line 16 of the Beijing Subway () is a rapid transit rail line under construction in Beijing. Line 16's route will run 49.7 km in far western Beijing, parallel and to the west of Line 4. Construction began in December 2013 and is expected to be completed by 2016. The line will be managed by the Beijing MTR Corporation Limited and use eight-car high-capacity wide-body A-size trains.〔(北京地铁新线将用新编组可提高运能70%|北京|地铁|新线_新浪新闻 ). News.sina.com.cn (2013-04-25). Retrieved on 2013-07-12.〕 ==History== In 2009, Line 16 was among the 198 major urban planning projects listed by the city’s development and reform commission.〔(Chinese) ("北京地铁16号线初定重要站点 拟过动物园、国图等" ''北京晚报'' ) 2010-06-29〕 At that time, Line 16 was slated to run about 35 km from Huilongguan in Changping District to Huaxiang in Fengtai.〔 According to the June 2010 plans, Line 16 in the far north will take the place of Line 4’s northern extension and run 48 km from Beianhe in Haidian District south to Xiaoyueyuan near the Marco Polo Bridge in Fengtai District.〔(Chinese)("北京地铁16号线城西贯通南北" ''法制晚报'' ) 2010-06-29〕 The line would begin near Beianhe, and provide access to parts of Haidian, north of the foothills the Western Hills that extend into district. For this reason, the line is also called the ''Haidian Back Mountain Line'' because it begins on the backside of the low-lying range that extends from the Fragrant Hills to the Summer Palace.〔 Points of interest that the line may pass along route to Xiaoyueyuan in the south include the Summer Palace, Haidian Gymnasium, National Library, Purple Bamboo Park, Beijing Zoo, Chegongzhuan West Road, Sanlihe, Wanshou Temple, Lize Financial District, and the Fengtai Railway Station.〔 The June proposal was scaled back in December 2010 to just 23 km, from Suzhoujie to Wanping, but has subsequently been restored to 49 km.〔(Chinese) ("北京地铁16号线规划方案获批复 起点为苏州街站" ''人民j网(北京)'' ) 2010-12-29〕 The Beijing Municipal Commission of Urban Planning released the plans for several subway stations in 2013.〔(Chinese) ("北京地铁16号线车站设计方案展示" ) 2013-4-25〕 Construction began in December 2013.〔(Chinese) (北京地铁16号线丰台段正式开工 共设8座车站 ) 2013-12-11〕 The northern section of the line from Beianhe to Xiyuan may open as early as the end of 2015.〔(Chinese) ("北京地铁16号线北段有望明年底开通 总里程19公里" ''人民网(北京)'' ) 2014-5-29〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 16, Beijing Subway」の詳細全文を読む スポンサード リンク
|